What is the installation specification of the cold storage installation manufacturer?
Release time:
2021-07-26
Cold storage installation manufacturers install and utilize cooling facilities and equipment, build warehouses that meet appropriate humidity and low temperature conditions, purchase consumables and materials for various refrigeration equipment and facilities, build library boards, hoisting internal and external machinery, layout of connecting pipes, insulation of pipes, installation of drainage pipes, installation of lines, installation of control systems, wiring of internal and external power cables and system debugging processes.
Cold storage installation manufacturers install and utilize cooling facilities and equipment, build warehouses that meet appropriate humidity and low temperature conditions, purchase consumables and materials for various refrigeration equipment and facilities, build library boards, hoisting internal and external machinery, layout of connecting pipes, insulation of pipes, installation of drainage pipes, installation of lines, installation of control systems, wiring of internal and external power cables and system debugging processes.

As the cold storage country gives priority to the front-end industrialization field, the competition in the refrigeration industry is particularly prominent, and choosing the field with high professionalism and customer satisfaction has become the key.
What is the installation specification of the cold storage installation manufacturer?
The closer the compressor in the freezer is to the evaporator, the better. This is not only easy to repair, but also can dissipate heat well. When installing outdoors, pay attention to rainproof, place dust-proof gaskets at the four corners of the main engine, install horizontally firmly, and be careful not to touch easily.
1. Brass discharge: All brass must wear insulation pipes separately, packed with wires and air conditioning ropes in the same direction, take the shape of straight pipes as much as possible, and fix them with line segments. The insulation pipes and insulation clamps must be tightly attached with electric belts.
2. cold storage installation manufacturers install radiator: radiator installation position closer to the host, the better. The main engine is deflected, the radiator is installed in a cooling environment, and the suction port cannot be short-circuited to other equipment, especially the oil and gas, and the discharge port cannot be short-circuited to other windows (especially the windows of residents) and equipment. 2 meters above the ground, the installation level to be stable.
3. Wire performance configuration: The diameter of the wire steel wire meets the requirements, the joint is firm, it cannot be saved when the pipeline needs to be protected, and the electrical appliances are accurate. The wire entering the evaporator junction box hole needs silica gel sealing, and the grounding wire is required above 36V. The power supply in the main cabinet needs a three-phase five-wire system with reliable grounding.
4. Air conditioning system connection: The condenser and evaporator of the main engine are sealed in the factory. There must be pressure when unsealing. You can check whether there is leakage. The brass ends of the factory must have dust-proof measures, and they must be sealed at any time during construction. Use waterproof dust to enter the tube, the condenser host evaporator, and the copper tube are connected by welding method, and the interface is firm
5. Wire discharge: In addition to tying all wires together with air conditioning ropes, wrinkled hoses or silhouettes should be used to protect the pipes. Try not to let the wires rely on the wires for temperature.
6. The cold storage installation manufacturer installs the temperature adjustment probe: the probe and the temperature indicating probe are suspended in the air together through the evaporator ventilation hole in the warehouse, the frost temperature adjustment is also fixed on the sky board, the probe is drilled another hole, the probe is inserted into the evaporator ventilation hole in the warehouse (no contact with the electric heating tube), the temperature adjustment and the frost temperature adjustment are fixed in the corner behind the evaporator in the warehouse, and all wiring is sealed. 7. Install the balance window: do not install it in a conspicuous place and on the exhaust port bracket, and the height is 200mm below the bracket.
8. Sealing of the library board: All parts penetrating the library board, the library board and the gap between the parts shall be sealed with sealant.